Kai Tak Dev. Trunk Road T2
Meinhardt is in JV with another consultant for investigation, design and construction of a dual 2-lane trunk road connecting with the Central Kowloon Route at the north apron area of KTD and the Tseung Kwan O – Lam Tin Tunnel at Cha Kwo Ling.